Skip to main content

Waihou Valley Scheme – Service Level Review

TR 2012/12

Report: TR2012/12

Author: Murray Mulholland

About the document

This report presents a review of service levels for the Waihou Valley Scheme main floodway stopbanks, stoplogs and spillways. As assessed in this review, the current performance of the Waihou Valley Scheme main floodway stopbanks is marginal in terms of the Zone Management Plan performance target (i.e. no more than 2% of stopbanks are below design flood level). Approximately 2% by length (2.5 km) is within performance category 5 indicating that remedial work is required within the next 3 years. 

Read the document

Waihou Valley Scheme – Service Level Review [PDF, 5.6 MB]