Stitchbury's pump station

Renewal works to replace the deteriorated original wooden beams, which were part of the pump station’s foundation, to extend its life. An operations team from our council removed the remains of the existing beams, and replaced them with newly designed concrete beams. The project consisted of a pump overhaul, new retaining walls, new walkway, steps and new landing for the crane. The project was successfully completed and is now used as an example for similar future renewal works.